Wind farm optimisation of 40 planned wind turbines

 

Wind farm optimisation of 40 planned wind turbines

Site: Bosnia-Herzegovina

Results:

  • Due to a pronounced main wind direction, the lay-out was modified to a single row instead of two rows. Small spacing between the turbines was adopted in change.
  • With this lay-out, more turbines could be placed on a mountain ridge which forms part of the area.